Intent continuity and conformance during degradation
When operating conditions deteriorate, the intent does not disappear. Chinje keeps the declared intent, actor identity, authority context and provenance requirements available to the degraded transition, so the reduced mode can be assessed against the same obligations as normal operation.
Chinje classifies drift and determines conformance from observed evidence, including whether a degraded mode stayed within the declared contract. Recovery is a governed transition authorised through the same context — not an automatic return to full operation.
Chinje is the sole evidence-sufficiency and conformance authority in the platform architecture. λ-Safe defines and verifies admissible boundaries; the Control Plane and runtime authorise, enforce, observe and reconcile; Chinje decides what the evidence means.
