Architecture overview
Components, dependency boundaries and the control points between intent, admission, mediation, execution, observation and evidence.
Documentation
Architecture, platform concepts, λ-Safe and invariant preservation, safe degradation, security boundaries, evaluation guidance and integration scope. This hub documents what is actually public; operator documentation and interface contracts are provided under engagement rather than invented for the website.
Documentation map
Each entry points to material that exists. Where a document is not public, the page says so instead of publishing a placeholder.
Components, dependency boundaries and the control points between intent, admission, mediation, execution, observation and evidence.
Intent governance, invariant compilation, independent admission, scoped permits, registered mediation, observation and conformance.
What is enforced, what is partial and what is outside the NARG mediation boundary. Includes the buyer evaluation checklist.
How a bounded evaluation is scoped, what deployment planning involves and why production qualification is a separate stage.
What is publicly stated about registered mediation, permit verification and execution adapters — and what is not published.
Public integration state, maturity labels from the engineering registers and an honest account of what is unconfigured.
How supported invariants are compiled and refused, what must remain true in a degraded mode, and what the research does and does not establish.
λ-Safe and invariant preservation
λ-Safe is the verification and refusal component of the lifecycle. It formalizes supported contracts, compiles supported invariants, verifies admissible transitions and refuses what it cannot decide. It does not execute, permit or enforce anything at runtime.
A governed operation begins with explicit obligations. λ-Safe turns the supported ones into machine-checkable contract artifacts and produces a a scoped verification record with a recorded checked/not-checked boundary. Supported invariants are currently a bounded numeric fragment; unsupported, indeterminate or contradictory mandatory clauses are refused rather than approximated. “Unknown is not proof” is the design rule.
Invariant preservation is the requirement that declared safety properties remain true across every admitted action and every admissible mode, including a reduced or degraded mode. It is not the same question as availability: failover, retry, caching and health checks preserve service continuity, but they do not by themselves establish that a transition is still admissible. The security page states this distinction and the failure modes that follow from it.
The λ-safe research model explores degradation as an explicit, verification-gated transition: a system may reduce functionality or capacity while preserving mandatory invariants, and recovery requires fresh verification rather than a stale certificate. This is a published research direction with a conceptual published model, plus a deterministic simulation in the interactive demo. Production runtime degradation enforcement is not implemented or verified.
λ-Safe participates in contract formalization, after intent translation. Its outputs are consumed at admission, in decision constraints and in conformance evidence. Its invariants are revisited when reconciliation detects drift and when degradation changes the admissible operating envelope.
Compiled support is a bounded numeric fragment: a deliberately bounded class of hard invariants and admissible transitions for supported contracts. Symbolic, relational, fractional and unrepresentable window constraints are excluded or refused rather than approximated.
Which conditions must hold in every admissible mode, how availability mechanisms differ from invariant preservation, and the three failure modes a degraded system can hide.
A published research model with a conceptual published model and a labelled local simulation. Research-grounded, not production-enforced, and with any reported overhead attributed to the paper.
Publication boundary
Buyers need to know which documentation exists before they ask for it. This table is the publication boundary for NiGeNje material.
| Surface | Access | What that means |
|---|---|---|
| λ-Safe research record | Public | Published on Zenodo with a stable DOI. Maintained by the publisher, not by this site. |
| λ-Safe Core source | Public · Apache-2.0 | Open-source Rust compiler repository. Licences and terms are governed by the repository. |
| Architecture and concepts | Public summary | Responsibilities, lifecycle and boundaries are described publicly. This is not an interface contract. |
| Platform source code | Private | Platform repositories are private and are deliberately not linked from this website. |
| Public HTTP API contract | Not published | No endpoint list, request schema, authentication flow or rate-limit policy is published. The site does not invent one. |
| Operator documentation | Under engagement | Runbooks, configuration and operational procedures are provided within a defined engagement, not on the public site. |
| Evaluation and qualification evidence | Under engagement | Detailed engineering evidence is reviewed with an evaluator. It is not a published certification. |
| Safe-degradation material | Public research + labelled simulation | The published research record and a deterministic demo scenario. No production runtime degradation enforcement exists to document. |
Operator documentation is provided under engagement. It is not published here because it depends on the agreed deployment topology, identity configuration and support boundaries. Requesting it does not create a support or service-level commitment.
Integration information
Public material describes the integration model and its boundaries. It does not publish endpoint names, request schemas or authentication flows, because no public API contract exists yet.
NARG mediates actions at registered points, verifies a permit against the exact action and arguments, keeps proposal separate from dispatch, and reads the effect back. Actions outside registration are not mediated.
Gatekeeper evaluates requirement gates independently of the executor and issues scoped, expiring, single-use permits bound to the action digest — or refuses with a specific reason.
Substrate applies effects through bounded adapters under a verified permit and supports read-back. Connector coverage is limited and no connector certification is claimed.
No public HTTP API contract is published. There is no endpoint catalogue, schema, token exchange or rate-limit promise on this site. Integration work is scoped against a confirmed contract under engagement.
This site intentionally publishes no API URLs. Anything that presents itself as a NiGeNje API endpoint without a confirmed contract should be treated as unverified.
Evaluation guidance
The sequence below keeps a bounded evaluation separate from deployment planning. Each stage is agreed on its own; completing one does not imply the next.
Choose one workflow, one class of action and the invariant or obligation that must not be broken. A broad scope makes an evaluation unreadable.
Identify which actions would pass through a registered mediation path and which bypass paths remain. Bypass paths are part of the evaluation, not an afterthought.
Confirm which identity provider, policy context and evidence sources are available. Where they are absent, admission should fail closed and say why.
Exercise the admitted, denied, diverged and unavailable paths against defined fixtures. Do not use production systems or production personal data.
Inspect what was recorded, what was observed independently and what remained unknown. Record what the evaluation did not cover.
Production topology, identity, key management, observability and support boundaries are a separate stage. Earlier stages do not imply production qualification.
Documentation questions
There is no public API reference. No endpoint list, request schema, authentication flow or rate-limit policy for the NiGeNje platform is published today. This page deliberately does not invent one. Integration scopes are defined under engagement and against a confirmed contract.
Operator documentation — runbooks, configuration, deployment procedures and operational limits — is provided under engagement. It is not published on this website because it depends on the deployment topology and the agreed scope.
Public pages are maintained with the site source and the engineering registers behind it. Maturity labels describe verified engineering state at the time of writing; they are not a service-level statement. Re-verify the specific claims that matter to you during an evaluation.
No certification, compliance attestation or audit pack is claimed or offered. Evaluation evidence can be reviewed with you under an engagement, and the security page states plainly what is not claimed.
No supported-integration count is published, because connector coverage is still being built and certified connectors are not claimed. Integration work is scoped per engagement rather than sold as a catalogue.
No. λ-Safe is a verification and refusal component: it formalizes supported contracts, compiles supported invariants, verifies admissible transitions and records the checked/not-checked boundary. It does not intercept actions, issue permits or contain failures. Gatekeeper, NARG, Substrate and the Control Plane own runtime admission, mediation, execution and coordination.
No. Safe degradation is a published research model with a conceptual published model and a labelled, deterministic simulation in the interactive demo. The documentation describes the model and its boundaries; production runtime degradation enforcement is not implemented or verified, so it is not documented as a shipped capability.
Looking for the published research record? It is available at doi.org/10.5281/zenodo.17067644.
Next step
If a document you need is not public, ask whether it is covered under engagement. Nothing on this page is a substitute for a confirmed contract.